题目信息
In the first 2 hours after Meadow's self-service laundry opens, m large washing machines and n small washing machines are in continual use. Including the time for filling and emptying the washing machines, each load of laundry takes 30 minutes in a large washing machine and 20 minutes in a small washing machine. What is the total number of loads of laundry done at Meadow's self-service laundry during this 2-hour period?
A:Statement (1) ALONE is sufficient, but statement (2) alone is not sufficient.
B:Statement (2) ALONE is sufficient, but statement (1) alone is not sufficient.
C:BOTH statements TOGETHER are sufficient, but NEITHER statement ALONE is sufficient.
D:EACH statement ALONE is sufficient.
E:Statements (1) and (2) TOGETHER are NOT sufficient.
参考答案及共享解析
共享解析来源为网络权威资源、GMAT高分考生等; 如有疑问,欢迎在评论区提问与讨论
正确答案: B:Statement (2) ALONE is sufficient, but statement (1) alone is not sufficient.
Algebra Simultaneous equations
During the two-hour period each large washer does four loads (the number of 30-minute periods in two hours is four) and each small washer does six loads (the number of 20-minute periods in two hours is six). Therefore, the total number of loads done during the two-hour period by m large washers and n small washers is 4m + 6n.
 If m = 1 and n = 3, then n = 3m and the total number of loads of laundry done in the two-hour period is 4(1) + 6(3) = 22. However, if m = 2 and n = 6, then n = 3m and the total number of loads of laundry done in the two-hour period is 4(2) + 6(6) = 44; NOT sufficient.  Since 2m + 3n = 55, it follows that 4m + 6n = 110. Therefore, by the remarks above, the total number of loads done during the two-hour period is 110; SUFFICIENT.
The correct answer is B;statement 2 alone is sufficient.
笔记

登录后可添加笔记, / 注册

加入收藏
在线答疑
题目来源
Hi,欢迎来到PAPA GMAT!
课程推荐
备考攻略
Copyright © 2015-2023 上海彼伴网络科技有限公司 沪ICP备2023023608号-2

网站维护公告

因版权方要求,我站部分题库资源将暂停访问,由此给大家带来的不便我们深表歉意。具体恢复时间将另行通知。
请关注趴趴GMAT公众号【趴趴GMAT商科留学】获取最新资讯和其他备考干货;免费集训营和权威公开课亦将循环开设,欢迎各位同学积极报名参加,感谢各位同学的理解和支持。
趴趴GMAT
2019.10.14
确认