题目信息
Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston.
A:Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve
B:Concerns about public health have led to the construction of three separate sewer systems between 1876 and 1904 to serve
C:Concerns about public health have led between 1876 and 1904 to the construction of three separate sewer systems for serving
D:There were concerns about public health leading to the construction between 1876 and 1904 of three separate sewer systems serving
E:There were concerns leading between 1876 and 1904 to the construction of three separate sewer systems for serving
参考答案及共享解析

共享解析来源为网络权威资源、GMAT高分考生等; 如有疑问,欢迎在评论区提问与讨论
本题耗时:
已选答案:
正确答案:
A:Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve
选项分析:
A. Correct;
B. lead发生在过去,不应该用现在时态(现在完成时);Between 1876 and 1904有修饰systems的歧义,意思变成了systems就在1876和1904年之间被使用。
C. 时态错误。Between 1876 and 1904放在lead后面不好,时间状语通常位于句首或句尾,即便无法谓语句首或句尾,也应该尽量靠向两边,而且lead to construct/lead to the construction是一个整体,不应该被打破;表示动作的目的用to do而不用for doing。
D. there are表示的是自然存在,现在concerns不是自然存在的,错误;Leading时态错。
E. there are错误同D;between 1876 and 1904错误同C;for doing错误同C。


题目来源
GWD