A construction project has been tasked with building a four-lane road from a remote mountain fortress to a major expressway lying at the base of the mountain. The slope leading to the mountain fortress is so precipitous that the only conceivable way to carry out the project is by building the road downhill, since construction equipment is able to move down, but not up, the steep terrain. The foreman has devised the following solution: dismantle each construction vehicle and tie a part upon the back of a donkey, an animal capable of making the steep ascent. The foreman has at his disposal more than 100 donkeys, each of which is capable of making multiple trips up the mountain.
In order for the foreman's plan to be successful, which of the following pieces of information is most important?
In order for the foreman's plan to be successful, which of the following pieces of information is most important?
A:Whether the strongest donkey is able to transport the heaviest piece of equipment
B:Whether the weakest donkey is able to transport the lightest piece of equipment
C:Whether any donkey is capable of transporting multiple parts
D:Whether the second strongest donkey is able to transport the heaviest piece of equipment
E:Whether the weakest donkey is able to transport the heaviest piece of equipment
参考答案及共享解析
共享解析来源为网络权威资源、GMAT高分考生等; 如有疑问,欢迎在评论区提问与讨论
本题耗时:
已选答案:
正确答案:
A:Whether the strongest donkey is able to transport the heaviest piece of equipment
权威答案解析正在整理中,即将上线。
加入收藏
在线答疑
题目来源
Magoosh